nc 29 rebuild

Forum rules
Please can you post items for sale or wanted in the correct For Sale section. Items / bikes for sale here will be removed without warning. Reasons for this are in the FAQ. Thanks
nickterrot
Settled in member
Posts: 21
Joined: Wed Feb 04, 2015 11:50 am
nc 29 rebuild

Post by nickterrot »

So I picked this up in February really cheap. Its been sat a while but after a strip down everything is usable.
Image
nickterrot
Settled in member
Posts: 21
Joined: Wed Feb 04, 2015 11:50 am
Re: nc 29 rebuild

Post by nickterrot »

jet washed the frame
Image
nickterrot
Settled in member
Posts: 21
Joined: Wed Feb 04, 2015 11:50 am
Re: nc 29 rebuild

Post by nickterrot »

rolling chassis back together :grin:
Image
nickterrot
Settled in member
Posts: 21
Joined: Wed Feb 04, 2015 11:50 am
Re: nc 29 rebuild

Post by nickterrot »

binged up top yoke
Image

cleaned up forks and rebuilt calliper's
Image
nickterrot
Settled in member
Posts: 21
Joined: Wed Feb 04, 2015 11:50 am
Re: nc 29 rebuild

Post by nickterrot »

damage to engine cases sanded out.
Image
nickterrot
Settled in member
Posts: 21
Joined: Wed Feb 04, 2015 11:50 am
Re: nc 29 rebuild

Post by nickterrot »

Body work plastic welded and primed
Image
nickterrot
Settled in member
Posts: 21
Joined: Wed Feb 04, 2015 11:50 am
Re: nc 29 rebuild

Post by nickterrot »

Body work painted. Still got loads of plastic welding and painting on the belly pan.
Image
dunkenb
Regular Member
Posts: 560
Joined: Wed Jun 03, 2009 9:39 pm
Bike owned: Cbr400rr nc29 type8 NSR250
Location: West Midlands
Re: nc 29 rebuild

Post by dunkenb »

Looking good, youve obviously been very busy! 8-)
nickterrot
Settled in member
Posts: 21
Joined: Wed Feb 04, 2015 11:50 am
Re: nc 29 rebuild

Post by nickterrot »

Engine and carbs cleaned, valve clearances checked, clutch plates inspected and Covers painted. 8-)
Image
nickterrot
Settled in member
Posts: 21
Joined: Wed Feb 04, 2015 11:50 am
Re: nc 29 rebuild

Post by nickterrot »

Yea bean pretty much working solid on it. Popped the engine in today. Also I had the original down pipes blasted , then I painted them with three cans of PJ1. They were solid so they have come up a treat. This bikes been a really fun build so far. Hopefully by lunchtime tomorrow I'll have it running ;)

Post Reply