Page 1 of 1

Breaking apart my NC29 project.

Posted: Sun May 22, 2016 10:27 pm
by damedichi
So, I'm selling off my project CBR due to the cash flow drying up with a new house and all, so I have a lot of bits to sell off if anyone is interested, including, but not limited to;

Carbs which have been ultrasonically cleaned and dynojet needles installed

Set of SAMCO hoses.

ZXR 400 front end, fit for NC29, with ZXR 400 front wheel, 310mm brake discs and six pot calipers from GSX-R 1000 with spacer to fit.

Wheels with Bridgestone BT 090 tires, only 300miles on them. Cush rubbers replaced and not used, brand new renthral rear sprocket.

Rear shock from A CBR 600 from Graeme France with Ohlins spring

Graeme France stainless steel down pipes

Professionally polished swing arm.

Engine, good running condition, with cleaned and scuff free stator and clutch covers (not pictured.)
Two subframes, one cut down, the other original.

EBC kevlar clutch kit

All over parts, engine, frame ect. No fairings.

PM if interested :grin:

Re: Breaking apart my NC29 project.

Posted: Fri May 27, 2016 9:28 am
by gravis
I dont suppose you have the left side air guide? part number 17106-MV4-000

Re: Breaking apart my NC29 project.

Posted: Sun May 29, 2016 4:55 am
by fastrob691
Sent you a pm sir

Re: Breaking apart my NC29 project.

Posted: Tue Jun 07, 2016 7:51 pm
by solim
Does the GF header have balance pipes i between the pipe 1+2 and 3+4?

Re: Breaking apart my NC29 project.

Posted: Thu Jun 23, 2016 12:22 pm
by tanuki
Please can you put a for sale add in the for sale section thanks