Page 1 of 3

Just Started a 3TJ Full Rebuild

Posted: Sun Jan 30, 2011 6:46 pm
by Daz H
I just dug out a 3TJ that's been sitting in my lock up for about 5 years, looked a bit rough at first but came up OK after a clean. It's going to get a full strip down and rebuild over the next couple of months and I'll put some photo's on as I go.

If there's anything anyone wants a pic of while I'm working on it let me know as most things will be apart at some point.

It looks OK up to now, almost everything is there including all original bodywork, good downpipes and what seems to be a shock with damping (which was a shock). The forks have a bit of surface rust on the inner stanction so they'll be comming apart and may need replacing.

Things I need at the moment are:

Generator cover
Water pump cover
Screen brace - Got it!
Screen
Right hand clip on - Got it!
Rear light surround

If anyone has any of the above PM me!

The bike as I found it:
Image
Image

A bit of a clean and some bits removed:
Image

Re: Just Started a 3TJ Full Rebuild

Posted: Mon Jan 31, 2011 8:06 pm
by Daz H
Thanks to the forum I think I have all the parts I've listed already :rocks:

It's gonna be a powder coating weekend I think...

Re: Just Started a 3TJ Full Rebuild

Posted: Mon Jan 31, 2011 8:59 pm
by Evilchicken0
That doesn't to bad from the pics - I'll look forward to some more as the work goes on.

Re: Just Started a 3TJ Full Rebuild

Posted: Mon Jan 31, 2011 10:11 pm
by Daz H
It's looking like a good one up to now:
Image

Just got to get the shock and swing arm out then it's time to start rebuilding (the engine's already been out)

Re: Just Started a 3TJ Full Rebuild

Posted: Tue Feb 01, 2011 7:58 am
by CRM
oooh get you and all the trophys up in the background ;)
So you racing again this year Daz ?

Re: Just Started a 3TJ Full Rebuild

Posted: Tue Feb 01, 2011 7:51 pm
by Daz H
Lol, I didn't notice them... Honest! I'm hoping to get out for a few, gotta do my noob test in Feb first :o £60 for that and a load for a transponder etc might mean I miss the first round but I'll be there at some point.

I'll sell the FZR that should fund a few rounds!

Re: Just Started a 3TJ Full Rebuild

Posted: Tue Feb 01, 2011 8:04 pm
by CRM
Darren, there is a load of us up at oulton on the 28th, if you can get a day off come up and meet some of the chaps on here.

Re: Just Started a 3TJ Full Rebuild

Posted: Tue Feb 01, 2011 8:15 pm
by nc23rider
CRM wrote:Darren, there is a load of us up at oulton on the 28th, if you can get a day off come up and meet some of the chaps on here.
Is that the the track day ? if it is i'm booked on the 26th !

Re: Just Started a 3TJ Full Rebuild

Posted: Sat Feb 05, 2011 8:02 pm
by Daz H
Is the track day on 26th or 28th? I can't get time off work at the moment as houses are selling well again, it's year end coming up and I'm saving holidays for the new arrival in May.

Image

I've started building it up but the battery I got for it doesn't fit so I can't test the electrics, bugger. My book says it should be a CB12AL-A2 but it's way too tall; will have to sort it on Monday.

Better luck next weekend!

Re: Just Started a 3TJ Full Rebuild

Posted: Sat Feb 05, 2011 10:13 pm
by Evilchicken0