Page 3 of 6

Re: New project;plenty of work required.

Posted: Thu Jun 20, 2013 7:26 pm
by willandrip
Spot on Phill.that would be excellent.
The battery box is a straight swap and I can modify the seat bracket.
2TK's are mostly Genesis anyhow. :grin:

Re: New project;plenty of work required.

Posted: Thu Jun 20, 2013 11:43 pm
by freefallfil
I'll message you in the morning & take it from there,glad to be of use, laters Phil. :grin:

Re: New project;plenty of work required.

Posted: Mon Jun 24, 2013 10:04 pm
by willandrip
Friday afternoon sourced some consumables for the work ahead ,£30 for a gallon of degreaser and a tub of copperslip=shocking !

Sat morning;first job was sort out newly arrived spares and assemble yet another cheap paddock stand.
Image

Image

Harris oval can and linkpipe compared to existing exhaust

Image

Weighs about a 1/4 of the exup one.
Inlet was slightly out of round but tidied up ok with the mandrel.

Image

On to the hanger; this was mounted in the incorrect position which prevents the original coolant reservoir being utilised.

Image
Image

Hanger re-positioned and reservoir fitted;spot the problem ?

Image

The can strap is now completely in the wrong position.
The original 2TK can is supported here but with the YZF engine and pipe ,using the original hanger is a no go;it is too bulky
Projection components replacement hanger will cure this.
Can,strap and seat unit mock up.

Image
Modified exhaust support repositioned.

Image

Stripped,degreased and powerwashed.
Image
Image

Chain had flailed off/snapped at some point, although casing is usable I have a spare 1000 unit to go on.

Image


New pushrod and seal had been fitted by a P.O.

Image

On Sunday,Freefall Phil called in for a chat and very kindly donated a Genesis battery box and rear tank locating bracket which moved the project forward massively .
The undertray and rear mudguard and hence most of the electrics are dependant on this being fitted first.
Wiring harness is 9/10th Yzf as suspected
New fuel pump position;no space for a fabricated bracket but rubber casing gives ample support.

Image

Top yoke tidied up and tank strap fitted along with an ignition decal from the stickers box.

Image

Missing tank ring screws fitted,cannot believe I had these lying about, I think they were incorrectly fitted to a brake reservoir cap on a 3en2 previously !

Image

Coolant pipework tidied up somewhat.

Image

I am not happy with this setup at all, but there does not seem to be a better alternative.

Have decided tank and seat unit paintwork is near enough for what this bike is.

Image
Image
Image

Was going to repaint but I don't think bike warrants the expense.

Replacement calipers and hoses ;overhauled and ready to fit.

Image

Next weekend ; front forks overhaul and swinging arm strip.

Re: New project;plenty of work required.

Posted: Tue Jun 25, 2013 9:19 am
by Evilchicken0
Cleaning it seems to have made a world of difference - that must be good degreesant ;)

Maybe put the rear suspension remote on the other side so the can's mounting bracket has a clearer route. Weren't they on the left originally ?

Re: New project;plenty of work required.

Posted: Tue Jun 25, 2013 9:26 am
by Kayla850
Nice work Bill! I'd like to see this in the metal one day.

edit- is that a TZ350 tank strap from Yambits? I need one for my 2TK chassis.

Re: New project;plenty of work required.

Posted: Tue Jun 25, 2013 10:31 am
by freefallfil
You've been busy over the weekend,obviously the rain didn't stop you or my little visit.Glad to be of help & keep up the good work-will be good to see when you're finished with it!! :grin:

Re: New project;plenty of work required.

Posted: Tue Jun 25, 2013 7:31 pm
by willandrip
Good thinking on the remote re-position Boris.
The original fixing point is as shown (rhs).
The problem is the coolant reservoir;it entwines with the subframe and the rail the shock remote is fixed to ,but you have certainly given me ideas.
Yes,its cleaning up quite well.
The hot water feed to the powerwasher helps massively when getting rid of 26 years of road filth.


Kayla; yes its a Yambits one;
Got your chassis then?
I'm a bit jealous ;)
Whats the plan.?
Call in when you go to a NEMCRC meeting or both you and Chris get on your bikes on a Sunday and have a ride up ;could go for a burn after.!

Yes Phil,once the battery box was fitted,the rest just fell into place.
Once again .thanks for the help with the parts.

Forgot to mention, carbs were overhauled on Saturday and judging by the muck in the bowls,the massive fuel filter had been used for a reason.
Tank was clean inside after a rinse.( P.O had done similar.)
Needles somewhat worn and could do with replacement (NLA)
Air filter was new, as was coolant.
Fresh oil and cheap filter to be used for first 100/150 miles when built up,then a proper service after shakedown to be done.

Re: New project;plenty of work required.

Posted: Tue Jun 25, 2013 9:27 pm
by Kayla850
willandrip wrote:Kayla; yes its a Yambits one;
Got your chassis then?
I'm a bit jealous ;)
Whats the plan.?
Call in when you go to a NEMCRC meeting or both you and Chris get on your bikes on a Sunday and have a ride up ;could go for a burn after.!
Brill, thanks, I just ordered one for mine!

We don't have any plans for it yet, I'm umming and ahhing over whether to stick a 600 in it or not. There are some really nicely thought out bits on them aren't there? The tank was surprisingly clean inside too, which was nice.

Re: New project;plenty of work required.

Posted: Wed Jun 26, 2013 6:12 am
by willandrip
Did your chassis come with the bracket/support that fixes the rear of the tank and secures the seat?
I have yet to see one.
On Mark's I fabricated a captive nut but it is not optimal.

Re: New project;plenty of work required.

Posted: Wed Jun 26, 2013 6:42 am
by Kayla850
willandrip wrote:Did your chassis come with the bracket/support that fixes the rear of the tank and secures the seat?
I have yet to see one.
On Mark's I fabricated a captive nut but it is not optimal.
There is a bracket that does that job but it looks far from standard :shock: They must all get damaged or lost, like the rear centre panels for 3EN2s :lol: