Instrument panel strip down

Forum rules
Please can you post items for sale or wanted in the correct For Sale section. Items / bikes for sale here will be removed without warning. Reasons for this are in the FAQ. Thanks
Post Reply
socket13
Settled in member
Reactions:
Posts: 37
Joined: Fri Mar 06, 2015 4:03 pm
Bike owned: Honda SP1, BSA Golden Flash, H
Location: Haddington, East Lothian
Contact:
Instrument panel strip down

Post by socket13 » Tue Mar 31, 2020 10:56 am

Anyone know how to deal with the round plastic rivets that hold the black foam that supports the clocks?

cbr400rrn
Site Supporter
Site Supporter
Reactions:
Posts: 1269
Joined: Tue Apr 29, 2008 9:37 pm
Bike owned: NC29 CBR600F
Location: Lancashire
Re: Instrument panel strip down

Post by cbr400rrn » Tue Mar 31, 2020 9:49 pm

Isn't the foam on the front just pushed over the black plastic lugs. Or am i talking about a different foam on the clock surrounds

socket13
Settled in member
Reactions:
Posts: 37
Joined: Fri Mar 06, 2015 4:03 pm
Bike owned: Honda SP1, BSA Golden Flash, H
Location: Haddington, East Lothian
Contact:
Re: Instrument panel strip down

Post by socket13 » Wed Apr 01, 2020 1:34 pm

Never thought of that, managed to remove them, if you look at the bit that goes through the back of the mounting panel you’ll see this sides stick out a tiny bit, I squeezed them together with a pair of needle nosed pliers and they pop out the front


Post Reply